How a credit is measured
One credit = ₪0.40, worked out from tokens actually measured, after the version was saved.
One credit costs ₪0.40. We write that out, because it is exactly what nobody in this category is willing to say — what you are buying when you buy a “credit”.
Estimate before, measurement after
Before every build an estimate is shown and the ceilings you set are checked. If the request goes past them it is stopped before a single token is burned.
At the end, the charge is worked out from the tokens the model actually reported, cached-content discount included. Not from the estimate — and the estimate is never the bill.
What is not charged
- A build that failed the check — not saved and not billed
- Its automatic repair round
- A build interrupted halfway
You can follow it
Every credit movement is recorded with the build that caused it. The “Billing and ceilings” screen shows the balance and the movements, and each project's “Log” screen shows every build with its tokens and its credits side by side.